Precautions for installation of stainless steel corrosion-resistant self-priming pump:
1. Since the pump arrives at the site of use through long-distance transportation, it is necessary to ensure that the entire mechanical parts are intact before installation, the fasteners must be tightened, check the concentricity of the pump shaft and the motor shaft, and make compensation in case of displacement.
2. When installing a corrosion self-priming pump, the hydraulic loss of the intake pipe must be minimized. Elbows below 90° cannot be installed. There must be no more than 2 elbows of 90° in the intake pipe. The pump inlet must have a filter to prevent a large amount of impurities After entering the pump, the pump works normally, and the length of the intake pipe is shortened to the greatest extent during installation (this can reduce the air in the intake pipe, thereby reducing the self-priming time and improving work efficiency).
3. The connection bolts of the water supply pipeline must be tightened evenly, the seal must be tight and cannot leak, and the soft flange seal (such as fluorine rubber) should be used to the maximum extent. Otherwise, it will seriously affect the self-priming performance of the corrosion-resistant self-priming pump.
Precautions for the operation of stainless steel corrosion-resistant self-priming pumps:
1. Check whether the working direction of the motor matches the working direction indication of the pump. Don't reverse!
2. The pump can only be started when it is filled with liquid. Shipping by air is strictly prohibited. Within the range of the fixed self-priming height of the pump, if the liquid has not flowed out within 7 to 10 minutes, the cause must be checked immediately (mainly to check the inlet leakage, so as to avoid the working medium in the pump from being heated and the pump damaged).
3. After the first injection of liquid into the corrosion-resistant self-priming pump body, it is usually not necessary to re-inject, but if the shutdown time is long or the seal leaks after shutdown, there is liquid loss in the pump, and the liquid in the pump must be checked before the second operation. Open after filling with liquid.
4. When not in use for a long time in winter, the liquid in the body should be drained to avoid freezing.